The short answer
If the stack serves nothing and you have no intention of a fire again, removing it down to below the roof line is often cheaper than rebuilding and removes the maintenance permanently. The arguments for keeping it are appearance, the option of a fire later, and planning constraints on a listed or conservation-area property.
Also asked: Take the chimney down or repair it? · Is it cheaper to remove a chimney stack?
Answered
A chimney that serves nothing is a maintenance liability with no benefit. It needs pointing, flaunching and flashings, and every one of those is at the top of the building behind a scaffold — which is where most of the cost of any chimney work actually sits.
Removal usually means taking the stack down to just below the roof line and closing the roof over. That is far less disruptive than removing the breast inside as well, it leaves the internal structure untouched, and it deals with all the external maintenance permanently. The flue below is capped and ventilated so the remaining masonry stays dry.
Doing it well is about weathering the closed opening. The gap is decked and battened to match, the underlay is made continuous, and the covering is cut in so the repair sits flush and sheds water like the rest of the slope. A well-closed chimney opening is hard to spot from the ground; a badly closed one is a permanent visible patch and a future leak.
Rebuilding is the answer where the stack is still wanted or where its appearance matters to the building. It means a controlled dismantle to sound courses, salvaging and cleaning the good bricks, and rebuilding to match in bond and coursing with reclaimed brick making up the shortfall. It is also the moment to renew everything else — flaunching, pots or a vented cap, and new lead flashings — because the scaffold is up.
Two rules bite either way on a terrace. A stack sitting on the party wall is normally a party structure, so the work is notifiable under the Party Wall etc. Act 1996 and the neighbour gets two months' written notice. And on a shared stack you are frequently only dealing with your half, which leaves the neighbour's half exposed on a face that was never weathered — making that good is part of the job.
One more consideration before deciding: this is a job the doorstep trade targets heavily, because a homeowner cannot see their own chimney and a photograph of tired brickwork is persuasive. If somebody has told you unprompted that your stack needs rebuilding, get an independent look before agreeing to anything. A lot of stacks that 'needed rebuilding' needed repointing.
- Removal is often cheaper and ends the maintenance permanently
- Taking it to below the roof line avoids touching the breast inside
- Rebuilding is right where appearance or a future fire matters
- A shared stack means a party wall notice either way
- Get an independent opinion before agreeing to a rebuild